Correcting an environmental restriction before acquisition.
Challenge
Environmental records identified a nearby watercourse whose protection zone would have prevented construction on the property’s existing building platform.
Why it mattered
If the restriction were valid, the property could not support the intended residence. Acquiring it before resolving the issue would have exposed the buyers to a fundamental development risk.
HOPE.hc Response
HOPE.hc opened a formal case with the national water authority, requested a technical determination and attended the field inspection with the assigned specialist. The inspection established that the mapped feature was a rain-fed drainage channel rather than a protected watercourse.
Outcome / Current Status
The protection restriction was lifted and the property’s environmental position was clarified institutionally, allowing the acquisition to proceed on a reliable basis.